CPJTB EIFS Repair and Re-Coating Project
The six-story Chief Peter John Tribal Building(CPJTB) was originally designed for Nerco Minerals and construction was completed in 1984 or 1985. The existing Exterior Insulation Finish System (EIFS) of the building is worn and in need of spot repairs and re-coating. The goal of this project is to provide the entire exterior of the building with a “refreshed” look of …